Skip to content
FrontView
For property & asset managers

Prove what your building looked like, on any date.

Move-ins, move-outs, fit-outs and leaks all end with the same question: what was there before? FrontView captures your building, then comes back at every lease event. Each version is dated, measurable and comparable, down to the boiler nameplate.

A tall office lobby with wood paneling and stone floors
When the record pays for itself

A dated record for the moments that cost money.

You don't need a 3D model. You need proof of what the space looked like, and when.

A modern lobby with a stone reception desk and elevators

Lease start & end

Record the condition at move-in and at move-out, and settle the restoration conversation with a dated record.

Two people in hard hats reviewing plans on a tablet during a fit-out

Fit-outs & contractors

Document tenant improvements before, during and after, with measurements contractors can use.

Heating pipes, valves and gauges, close up

Incidents

A leak or a break-in? Compare against the last capture to show what changed.

Measure

Remote measurements

Answer “how wide is that corridor?” from your desk, without sending someone to the site.

frontview.com/b/123-main-street
Capture #1Feb 2024Capture #2Feb 2025Capture #3Apr 2026
Shared withLenderBuyerEngineer

Capital projects & diligence

Give lenders, buyers and engineers one link that holds the building’s full history.

123 Main Street+ Invite
OOwnerEverything
FFacilitiesEquipment
EEngineerPlans & files
TTenantSuite 210 only

Everyone on one record

Invite owners, facilities, engineers and tenants, and set what each can see.

Keep it current

See what changed since February 2024.

Schedule a recapture whenever you need one. Each becomes a new dated version, and FrontView shows the difference.

  1. 01Recapture at every eventAt lease start and end, after a fit-out or an incident, or on a schedule. FrontView reminds you when it’s due.
  2. 02Equipment, pinnedPanels, boilers and rooftop units with close-ups and nameplates, checked again at every capture.
  3. 03Exports includedFloor plans, measurements and source files, whenever you want them.
123 Main Street · Building recordExample
  1. Capture #1Feb 2024 · move-in
  2. Capture #2Feb 2025 · lease end
  3. Capture #3Next · lease start
What changed since Feb 2024
removedTenant partition walls, suite 210
changedCarpet replaced, suite 210
addedServer rack, room 214
changedRooftop unit RTU-2 replaced
Points of interest

Pin what matters in the building.

At the electrical panel, the boiler or the rooftop unit, the technician adds a point and takes close-ups. Each point is pinned where it sits, with nameplate and condition photos, and checked again at every capture.

A boiler room: pipes, valves, gauges, a pump and the boiler
Boiler room · Capture #2
Close-up of the boiler Close-up

Boiler

Replaced since Feb 2024
Cellar · Mechanical room
Photographed
Nameplate, burner, flue
Checked
Again at every capture
What people pin most
  • Electrical panels
  • Switchgear
  • Boilers
  • Rooftop units
  • Water heaters
  • Sprinkler risers
  • Fire alarm panels
  • Gas & water meters
  • Elevator machine rooms
  • Shut-off valves
  • Roof drains

Start your building's record. Keep it current.

FrontView captures it, facade & roof included, and comes back whenever it changes. Once it's in, it stays in, and every recapture adds to it.

Office buildings at dusk